Rapp-it Steel Putty is included with every Rapp-it Pipe Repair Bandage.

Rappit Steel Putty Application

Roughen and clean the area of the pipe to be repaired
Cut or twist off required amount.
Mix by kneading with fingers to a uniform colour. If mixing is difficult, warm putty to room temperature
Apply to surface within two minutes of mixing. Force into any cracks or holes and strike off excess material.



Steel Putty Application Hints and Tips

When applying to damp, wet or slowly leaking areas, work the mixed epoxy putty forcefully into the surface and apply pressure until adhesion begins to take effect
Use damp fingers for easier mixing, application and a smooth cured appearance. Remove excess material before hardening begins.
Curing: Steel Putty has a 4-7 minute work life. After 5-10 minutes it hardens and forms a tenacious bond. Final cure occurs in 60 minutes.



Steel Putty Specifications

Heat Resistance: 150°C (300°F)
Hardness: Shore D (full cure, 24 hours): 75 - 85
Set Time: 3 – 5 minutes
Chemical
resistance:
Resistant to hydrocarbons, ketones, alcohols, esters, halocarbons, aqueous salt solutions, dilute acids and bases

 

 

Rapp-it Steel Putty

   

 

 

Alatas UK Ltd, Unit B, Olympic Park, Low Moor, Bradford BD12 0LP
Tel: +44 1274 699222
Fax: +44 1274 699215
© 2018 Alatas UK Ltd